JISHUOBSOLESCENCE PARTS
Obsolete parts / Mitsubishi Electric / PLC

MELSEC FX3U series

DiscontinuedMitsubishi ElectricPLC

Still need this part? Email wuxiok2025@gmail.com with the quantity and a nameplate photo — 48-hour reply.

Still available in volume today, but the family is in its end-of-life window; buy tested stock before prices move.

01

Specification

OEMMitsubishi Electric
Product linePLC
StatusDiscontinued
ScopeFull series
Our supplyTested refurbished unit
Priority / confidenceB · verify with OEM notice
02

Why this keeps failing on site

  1. Legacy controllers are still on the floor while the OEM has stopped building them.
  2. Second-hand CPUs are often relabelled; firmware and I/O health are unknown until tested.
  3. The successor family rarely drops in: programs, I/O maps and sometimes terminal layouts change.
03

Three ways to get the line back

OptionBest whenLead timePrice basis
Tested refurbished unit
Original CPU, I/O simulation and 24 h burn-in, 12-month part warranty.
A program backup exists and the machine must run this week.3–10 daysPer unit, condition-graded
Successor migration
New CPU plus rewiring adapters and program rebuild.
The controller is one of several obsolete items.2–4 weeksCPU + engineering
Full retrofit kit
CPU, HMI, adapters, migrated program and commissioning support.
Downtime window allows a planned changeover.4–8 weeksProject price, milestone billing
04

What we need from you

  1. Nameplate photo and exact order number
  2. I/O list and module arrangement
  3. Program backup, or a functional description if none exists
  4. Required date and destination country

Send photos with a steel rule in frame — most dimension disputes are settled at quotation stage, not at delivery.

05

Questions buyers actually ask

Can I just fit a used CPU?

Mechanically yes, but unknown firmware and no program guarantee. We only ship units that pass I/O simulation and burn-in, with a 12-month warranty.

Does the program have to be rewritten?

Usually yes for a successor family. We rebuild and re-test from your backup, or from a functional description.

What is the lead time?

Refurbished 3–10 days; migration 2–4 weeks; full retrofit 4–8 weeks. Expedite is quoted separately.

What is warranted?

The part performs to specification for 12 months. Machine output and production loss are not covered.

RFQ — MELSEC FX3U series

48-hour reply: availability, lead time, price basis, and what we still need to confirm.

We reply within 48 hours with: availability, lead time, price basis and what we need to confirm. Or email wuxiok2025@gmail.com with the nameplate photo.

Supply terms

Compatible replacement, not OEM-branded. 50% advance, balance before shipment. 12-month part warranty. Freight and duty quoted separately. Quotation valid 30 days.