TD75 fixed belt conveyor (legacy)
Still need this part? Email wuxiok2025@gmail.com with the quantity and a nameplate photo — 48-hour reply.
The machine is fine; the parts catalogue is gone. Standard idlers will not fit a 30-year-old frame.
Specification
| Standard | TD75 (withdrawn); DTII / DTIIA current |
|---|---|
| Typical belt width | B500–B1000 |
| Common failures | Idler seizure, pulley lagging wear, take-up travel exhausted |
| Our supply | Made-to-measure idlers/pulleys, drive upgrades |
Why this keeps failing on site
- TD75 was withdrawn in favour of DTII/DTIIA; new machines are not built to it.
- Frames, bearing housings and cardan mounts vary by builder — no reliable standard drawing survives.
- Replacing a pulley usually means measuring shaft, centre distance and bearing seat, not ordering a part number.
Three ways to get the line back
| Option | Best when | Lead time | Price basis |
|---|---|---|---|
| Idlers & pulleys to measurement Made from your dimensions: roller diameter, shaft, bearing seat, slot type, lagging hardness. |
Frame is old or builder-modified. | 3–5 weeks | Per piece + measurement review |
| Drive upgrade Gearmotor + VFD sized from tonnage, belt speed and incline; adapter plate included. |
Drive is obsolete, noisy or single-speed. | 4–6 weeks | Per drive set |
| Line refurbishment Structure repair, take-up rebuild, belt replacement and alignment. |
Multiple failure points, or a planned shutdown. | 6–10 weeks | Project price |
What we need from you
- Belt width (B), roller diameter and shaft diameter
- Idler type and mount dimensions, or a photo with a ruler
- Centre distance, tonnes per hour, belt speed, incline
- Bearing model numbers from the old housings
Send photos with a steel rule in frame — most dimension disputes are settled at quotation stage, not at delivery.
Questions buyers actually ask
Do standard idlers fit a TD75 frame?
Often not. Cardan mounts and bearing housings were builder-specific, and 30 years of field modification makes a catalogue fit unreliable. We build to your measurements.
Can you work from photos only?
Yes for a first quotation, but production requires dimensions. A photo with a steel rule across the mount usually resolves it.
What is the minimum order?
Idlers from 20 pieces, pulleys from 1 piece, drive sets from 1 set.
Do you supply lagging?
Plain, diamond-groove and ceramic-lagged pulleys, rubber or PU, hardness stated on the drawing.
Lead time?
3–5 weeks for pulleys and idlers, 4–6 weeks for drive sets, 6–10 weeks for refurbishment projects.
RFQ — TD75 fixed belt conveyor (legacy)
48-hour reply: availability, lead time, price basis, and what we still need to confirm.
Supply terms
Compatible replacement, not OEM-branded. 50% advance, balance before shipment. 12-month part warranty. Freight and duty quoted separately. Quotation valid 30 days.